Select Language

Photographic memory

Photographic Memory: A major shift in forecasting

Photographic Memory Aramco Reservoir Management 1980s

In 1983, more reliable reservoir and production forecasting was made possible through the mathematical linking, or interfacing, of 600 of EXPEC’s reservoir and surface-facility simulators. The shift was of major economic significance to the company and the petroleum industry.